Proicere Digital Logo White

Automated BIM Model Health Checks and Automated Compliance Reporting

P2D - Automated BIM Model Health Checks and Automated Compliance Reporting
BIM Model Health Dashboard
BIM Model Health Dashboard
BIM Model clash reporting by design element, family and model area
BIM Model clash reporting by design element, family and model area

Automated monitoring and evaluation of BIM model health and clashes. Automated assurance and generation of KPI reporting ensures a healthy BIM model and effective clash detection, enhancing project delivery by maintaining precision and efficiency, and swiftly resolving issues to reduce delays and costs.

Key KPIs include: 

  • Model Accuracy: 95% or higher 
  • Model Completeness: 100% 
  • Data Consistency: Less than 5 inconsistencies 
  • Information Richness: 90% or higher 
  • Model Performance: Less than 10 seconds load time 
  • Number of Clashes: Zero critical clashes 
  • Clash Severity: Zero high-severity clashes 
  • Clash Resolution Time: Within 7 days 
  • Clash Density: Reduced by 90% 
  • Rework Costs Due to Clashes: Less than 2% of project budget 
BIM, 3D, 4D, and 5D Modelling: Enhancing Construction Projects
BIM, 3D, 4D, and 5D Modelling: Enhancing Construction Projects

BIM 3D, 4D and 5D Modelling and Reporting

Our Building Information Modeling (BIM) and data services integrate 3D, 4D, and 5D modelling to significantly enhance construction project management. Our BIM 3D component provides detailed visualisations and design accuracy, while 4D adds the element of time, facilitating effective project scheduling and timeline management. The 5D aspect incorporates cost data, change and risk, enabling comprehensive budget tracking, financial planning and detailed project reporting. These integrated models improve collaboration, reduce errors, and enhance decision-making throughout the project lifecycle.

Key Performance Indicators (KPIs):

  • Design Accuracy: 95% or higher 
  • Clash Detection Efficiency: 90% reduction in critical clashes 
  • Data Consistency: Less than 5 inconsistencies per model check 
  • Stakeholder Satisfaction: 85% or higher satisfaction rate 
  • Schedule and Cost Management: Significantly enhanced 

Automated BIM Model Health Checks and Automated Compliance Reporting

Download the Case Study

Fill up the form and download the Case Study on the next step

Ready to Get Started?

Tell us about your needs, and our team will be in touch to discuss the best options for your business.